Absen is the world's advanced LED display application and service provider, and its products are exported to more than 130 countries and regions such as America, Europe, Australia, Asia, Africa and so on
After the successful launch of the project, the production plan can be optimized, and the integration relationship with other resources can be established. The production scheduling can be automatically conducted according to the qualification and production capacity of the production workshop staff, which greatly simplifies the workload.
Realize the integrated management of technical documents, materials and work orders, multi-dimensional warning management and electronic kanban management on production site; conduct life warning control for equipment / tools, and feedback to the system in real time.
Formulate inspection plan to form PDCA cycle comprehensive quality management; improve and strictly control inspection links; establish perfect production traceability management system, fully all traceability information and one-click traceability to make the production process transparent.
Phone
TOP